| Included in the price |
| Modular building structure: steel frame, welded |
| Thermal insulation of external partitions: PUR foam |
| Thermal insulation of external partitions in accordance with the current requirements of the Building Law for residential buildings |
| Roofing: modular panels (so-called seam sheet) |
| Flashings: systemic |
| Eavesless gutter |
| Side wall elevation: 24 mm thick elevation board (larch) |
| Gable wall elevation: textured plaster |
| Window joinery: aluminum, 4-pane package |
| Door woodwork: RC2 anti-burglary steel door |
| Internal walls: drywall system |
| Internal finish of the walls: impregnated gypsum board |
| Electrical installation: switchgear with equipment and full wiring (without white assembly) |
| Water and sewage installation (without white assembly) |
| Heating installation: electric, surface (floor): foils and heating mats |
| Preparation of domestic hot water: flow heater with a power of 24kW |
| Ventilation: gravity |
| Internal finish - included in the price |
| Walls, ceilings: plasterboard |
| Joint filling |
| Primer and surface painting |
| Additional charge |
| DHW preparation: DHW cylinder slim type with 80l tank |
| DHW preparation: air-to-water heat pump |
| Split air conditioning |
| Mechanical ventilation with heat recovery: local recuperation |
| Elevation: modular panels (so-called seam sheet) |
| Facade: composite facade slats, HPL boards or PVC siding |
| Steel structure of the stairs |
| Stairs made of glued wood (oak) |
| Balustrades |
| Additional charge |
| Floors: laminate or vinyl floor panels, skirting boards |
| White electrical assembly (plug sockets, light switches) |
| Finishing the bathroom |
| Interior doors |
| Additional charge |
| Adaptation of the project to the building permit |
| Execution of foundations |
| Transport of the modules |
| Building area | Inner surface | |
| 40,83m2 | 47,94m2 |
| Lead time | No. of moduls | |
| 3 months | 2 |