Included in the price |
Modular building structure: welded steel frame |
Thermal insulation of external partitions: PUR foam |
Thermal insulation of external partitions in accordance with the current requirements of the Construction Law for residential buildings |
Flat roof: covering with polyurea membrane applied by painting |
Attic sheet metal flashings |
Rainwater drainage: roof rainwater inlets |
Facade basic materials: modular panels (so-called seam sheets) |
Facade supplementary materials: composite facade lamellas with a wood structure |
Window joinery: PVC, 3-glazed unit |
Door joinery: RC2 class anti-burglary steel doors |
Internal walls: dry construction system |
Internal wall finishing: impregnated plasterboard |
Electrical installation: switchboard with equipment and full wiring (without white assembly) |
Water and sewage installation (without white installation) |
Heating installation: electric, surface (floor): heating foils and mats |
Preparation of hot utility water: instantaneous heater with a power of 24 kW |
Ventilation: gravity |
Internal finish - included in the price |
Walls, ceilings: plasterboard |
Joint filling |
Primer and surface painting |
Additional charge |
Preparation of domestic hot water: slim storage water heater with an 80-litre tank |
Preparation of domestic hot water: air-water heat pump |
Surface water heating + central heating heat pump air-water type |
Split air conditioning |
Mechanical ventilation with heat recovery: local heat recovery |
Facade: 24 mm thick facade board (larch) |
Additional charge |
Floors: laminate or vinyl floor panels, skirting boards |
White electrical assembly (plug sockets, light switches) |
Finishing the bathroom |
Interior doors |
Additional charge |
Adaptation of the project to the building permit |
Execution of foundations |
Transport of the modules |
Building area | Inner surface | |
70m2 | 57m2 |
Lead time | No. of moduls | |
3 months | 1 |